Packaged Boiler


This project provided the engineering services for the installation of five (5) 80,000 PPH packaged steam watertube boilers and associated equipment to replace an aging steel mill power house. The project included equipment layout and interconnecting piping drawings for the five boilers, (3) deaerator tanks, (5) duplex water softener and brine systems, (8) chemical feed systems and (2) blowdown heat recovery units. Stress analysis was performed for all steam and boiler feed water piping including an analysis of the existing steam main at the tie-in to the plants steam distribution system. The civil/structural work included equipment foundations, pipe support towers and pipe support bents. Electrical general arrangements were developed in addition to single line diagrams, lighting and grounding plans.