December 11, 2014
J.R. Johnson Engineering provided engineering services for the installation of...
December 11, 2014
This project involved the installation of a new 14.4MVAR, 69kV...
December 11, 2014
This project required the replacement of the circuit breaker and...
December 11, 2014
This project required the replacement of the existing obsolete SCADA...
December 11, 2014
This project involved a complete new building on a green-field...
December 11, 2014
JR Johnson provided the engineering services for the design and...
December 11, 2014
This tubular quench & temper line project began with J....
December 11, 2014
J.R. Johnson Engineering provided the installation engineering services for pipe...
December 21, 2014
We inspected the caster structures for corrosion including all support...
December 21, 2014
J.R. Johnson Engineering inspected an existing crane runway’s fall protections...
December 21, 2014
This project provided the engineering services for the installation of...
December 21, 2014
J.R. Johnson Engineering provided engineering and design services for the...
December 21, 2014
J.R. Johnson Engineering provided engineering services for the installation of...
December 21, 2014
J.R. Johnson Engineering, Inc. worked closely with contractors to develop...
December 21, 2014
J.R. Johnson Engineering provided the preliminary and final design engineering...
December 23, 2014
Engineering services for the design and design drawings of new...
December 23, 2014
Over a period of six years, J.R. Johnson Engineering tracked...
December 23, 2014
This project included designing support structures, conveyors, conveyor support structures,...