This project required the replacement of the existing obsolete SCADA RTU with a new GE D20 SCADA RTU. The existing SCADA cabinet was utilized and retrofitted with all the necessary RTU modules and components. All required material was ordered and coordinated for delivery to meet the client’s in service date. All substation drawings were revised show all of the actual SCADA control and indication points.