Capacitor Bank Installation
This project involved the installation of a new 14.4MVAR, 69kV capacitor bank including new protective relays and control. Along with the capacitor bank, a new 69kV circuit switcher and SCADA RTU were also installed. The complete design package consisted of foundation designs, embedded conduits, schematics, wiring diagrams and bills of materials needed to install all equipment.