Steel Tube Processing Line Electrical

This project involved a complete new building on a green-field site and the installation of new steel tube equipment. The power requirements were tabulated and a complete power distribution system was designed utilizing a new 12.47kV utility service and four (4) new 12.47kV-480V substations and associated switchgear. All power and control wiring was sized according to NFPA 70 along with all exposed and embedded conduits.

JRJE